Northern Flame Yandi

R15,955

The Northern Flame Yandi is a large, heavy duty, multi fuel fireplace manufactured out of 120kgs of pure, Australian mineral iron ore. The cast iron is top quality and durable and is not produced from recycled or excess materials. It features a cast iron door, body and a thick, cast iron top which radiates heat long after the fire has dimmed down. It comes with a large, 42.5cm glass window, and a polished chrome handle and air control fittings. Heating a kettle of water and cooking is made easy its large flat top. This is very useful with our current power cuts and makes the Yandi a very dynamic fireplace model.

There is Primary and Secondary Combustion with air controls. Primary air enters via the air vent at the bottom of the door and feeds the fire from under the grate. Secondary air enters via the air vent above the door and is used for Secondary combustion and for the pre-heated air wash system that keeps the glass cleaner for longer. The Yandi also has an excellent overnight burn system. Its airtight door gaskets and manually controlled air vents allow you to close the stove down overnight. All you need to do is reopen the air controls, add fuel, and watch the fire roar again in the morning.

The large combustion chamber is lined with vermiculite firebrick and comfortably loads 50cm logs. There are heat resistant fire rope seals on the door, a cast iron baffle plate and a cast iron, multi-fuel ash riddling grate. The ash pan is removable for an easy clean. Included is an ash pan tool for ash pan removal; a glove for opening the door and adjusting the air levers; and an instruction manual. The legs of the Yandi are removable.

The Yandi is a high-end product manufactured to European design, in China, for the U.K. market. It is CE and British Standard EN approved and comes with a 5-year limited warranty.

Weight 120 kg
Dimensions (depth x width x height) 38 × 60.5 × 66 cm
Output kW

11

Heating Area

Energy Source

Energy Class

A

Flue Width

150 mm

Flue Configuration

Top and Rear

Material

Efficiency

75.00%

Or split into 4x interest-free payments Learn more

Lead time: 5-7 working days, subject to items being in stock. More info, or checkout to review shipping options.